Design the operating logic before buying the components.

MFG helps overseas buyers connect solar, storage, generators, grid and power distribution around the site's actual uptime, fuel, energy-cost and resilience objectives — then route the right China suppliers and interfaces.

Source mix before equipment listOperating modes before controls shortlistInterface ownership before procurement
MICROGRID CONTROL EMS / PLC dispatch protection monitoring mode logic SOLAR PV BESS / PCS GENERATOR GRID SWITCHGEAR · TRANSFORMER · LOADS SOURCE MIX PV · wind · genset · grid · BESS OPERATING MODES grid-connected · island · backup
01 · System Objective Gate

Five questions define the system before the supplier list.

A hybrid system should start from the site's operating objective, not from a pre-selected mix of panels, batteries and generators.

01

What must stay on?

Critical loads, maximum demand, starting loads and acceptable outage duration.

02

What sources exist?

Grid, PV, wind, generator, storage or another local energy resource.

03

What is the priority?

Resilience, fuel reduction, renewable utilization, tariff optimization or off-grid autonomy.

04

How should it operate?

Grid-connected, backup, island, generator-support, black-start or scheduled dispatch.

05

Who owns each interface?

Generation, BESS, switchgear, transformer, protection, EMS and commissioning responsibilities.

View system-objective decisions
What must stay on?

Critical loads, maximum demand, starting loads and acceptable outage duration.

What sources exist?

Grid, PV, wind, generator, storage or another local energy resource.

What is the priority?

Resilience, fuel reduction, renewable utilization, tariff optimization or off-grid autonomy.

How should it operate?

Grid-connected, backup, island, generator-support, black-start or scheduled dispatch.

Who owns each interface?

Generation, BESS, switchgear, transformer, protection, EMS and commissioning responsibilities.

02 · Renewable / Hybrid Routes

Four routes. Different levels of integration.

The category should distinguish generation assets from system-integration problems.

01 · SOLAR PV

Solar Power Systems

PV modules, inverter architecture, mounting, electrical balance-of-system and target-site generation profile.

Best route when: solar generation itself is the primary procurement problem.
Next decision: grid-tied / storage-ready / hybrid integration.
02 · SMALL WIND

Small Wind Systems

Site wind resource, turbine architecture, tower/foundation, controller, inverter and storage/grid interface.

Best route when: site wind resource justifies local generation.
Next decision: standalone source vs hybrid contribution.
03 · HYBRID POWER

Solar + ESS + Generator

Distributed energy sources coordinated to reduce generator hours, support loads and improve resilience.

Best route when: more than one source must share the same load.
Next decision: controls, reserve, generator minimum load, dispatch.
04 · MICROGRID

Grid-Connected / Islandable Microgrid

Local generation, BESS, grid, critical loads, distribution and controller operate as one controllable system.

Best route when: multiple operating modes and system-wide control are required.
Next decision: protection, islanding, synchronization, EMS/SCADA, commissioning.
03 · System Architecture

The power sources are only half the microgrid.

Controls, power distribution, protection and interface ownership determine whether independent equipment can actually operate as one system.

Source → Control → Distribution → Load

MFG separates equipment supply from system ownership so the buyer can see which party is responsible for each interface.

Sources PV · wind · generator · grid · BESS
Conversion PV inverter · PCS · generator controller
Control EMS · PLC · SCADA · microgrid controller
Distribution switchgear · ATS · transformer · protection
Loads critical · flexible · shedable · process loads
Power balance
Generation and load must remain balanced as renewable output and site demand change.
Verify → dispatch logic
Grid interface
Import/export, protection, synchronization and islanding depend on utility/site requirements.
Verify → PCC / protection
Generator interaction
Minimum loading, start/stop logic, spinning reserve and transient support need coordinated control.
Verify → genset controls
BESS role
Storage may provide energy shifting, reserve, ramp support, backup or grid-forming capability depending on platform and design.
Verify → operating mode
Distribution
Switchgear, transformer, ATS and protection define how sources and loads are electrically connected.
Verify → SLD / selectivity
Controls owner
One party must own the system sequence, communication map, mode transitions and site acceptance logic.
Verify → responsibility matrix
View system-architecture checks
Power balance

Generation and load must remain balanced as renewable output and site demand change.

Verify → dispatch logic
Grid interface

Import/export, protection, synchronization and islanding depend on utility/site requirements.

Verify → PCC / protection
Generator interaction

Minimum loading, start/stop logic, spinning reserve and transient support need coordinated control.

Verify → genset controls
BESS role

Storage may provide energy shifting, reserve, ramp support, backup or grid-forming capability depending on platform and design.

Verify → operating mode
Distribution

Switchgear, transformer, ATS and protection define how sources and loads are electrically connected.

Verify → SLD / selectivity
Controls owner

One party must own the system sequence, communication map, mode transitions and site acceptance logic.

Verify → responsibility matrix
04 · Operating Modes

Define the modes before defining the controller.

The same equipment can behave very differently depending on which source forms the grid and how transitions are managed.

01

Grid-Connected

Optimize solar/storage while utility grid remains available and defines the electrical reference.

Check → import/export · tariff · power factor
02

Backup / Island

Separate from the utility and maintain approved critical loads with the local source that is designed to establish the islanded electrical reference.

Check → transfer · grid-forming source · reserve · reconnection
03

Generator Hybrid

Coordinate generator, renewable and BESS to maintain stability while reducing unnecessary generator operation.

Check → min load · start/stop · transient response
04

Off-Grid / Remote

Local sources carry the full site with no reliable upstream grid.

Check → autonomy · recovery · redundancy · fuel
Island / Black-Start Capability Rule Islanding, black-start, grid-forming and seamless transfer are not assumed functions. They depend on the selected BESS/PCS, generator controls, switchgear/protection, controller logic and the site's approved operating architecture.
Engineering team reviewing power-system controls and supplier responsibilities
05 · Controls & Interface Ownership

The controller cannot fix an undefined responsibility matrix.

Before procurement, the buyer needs to know who owns the signal list, communications, protection, mode logic, generator dispatch, BESS commands, grid interface and site commissioning.

EMS / controllerDispatch objectives, source priority, reserve settings, load shedding and operating-mode sequence.
CommunicationProtocols, points list, data ownership, alarms, remote access and vendor interface responsibilities.
ProtectionGrid/source isolation, selectivity, synchronization and trip logic must align with the electrical architecture.
Generator controlStart/stop, loading, synchronization and reserve logic should match engine/genset operating constraints.
BESS controlPower/energy limits, SOC reserve, charge/discharge commands and grid-forming/following capabilities depend on the selected platform.
View controls / interface checks
EMS / controller

Dispatch objectives, source priority, reserve settings, load shedding and operating-mode sequence.

Communication

Protocols, points list, data ownership, alarms, remote access and vendor interface responsibilities.

Protection

Grid/source isolation, selectivity, synchronization and trip logic must align with the electrical architecture.

Generator control

Start/stop, loading, synchronization and reserve logic should match engine/genset operating constraints.

BESS control

Power/energy limits, SOC reserve, charge/discharge commands and grid-forming/following capabilities depend on the selected platform.

Equipment Supplier

Can provide one or more assets.

PV module / inverter / mounting / BOS
BESS battery / PCS / BMS / EMS
Generator engine / alternator / controller
Distribution switchgear / transformer / ATS

System Integrator

Owns how assets work together.

Architecture SLD / source / load / interface definition
Controls sequence / EMS / communications / dispatch
Protection grid / island / synchronization / coordination
Commissioning mode testing / fault recovery / acceptance
06 · Project Workflow

Build the architecture before you split the purchase orders.

MFG's role is to keep the buyer's requirement and interface boundaries visible while suppliers are compared and coordinated.

01

Site / Load Baseline

Load profile, outage history, existing grid, generators, PV, electrical SLD, operating constraints.

02

Concept Architecture

Source mix, BESS role, operating modes, controller, distribution and responsibility boundaries.

03

Supplier / Interface Review

Verify subsystem capability, communication compatibility, drawings, protection and commissioning scope.

04

FAT / SAT / Handover

Factory checks, site mode tests, control tuning, fault recovery, operator handover and open-item closure.

View project workflow
Site / Load Baseline

Load profile, outage history, existing grid, generators, PV, electrical SLD, operating constraints.

01
Concept Architecture

Source mix, BESS role, operating modes, controller, distribution and responsibility boundaries.

02
Supplier / Interface Review

Verify subsystem capability, communication compatibility, drawings, protection and commissioning scope.

03
FAT / SAT / Handover

Factory checks, site mode tests, control tuning, fault recovery, operator handover and open-item closure.

04
Power system site safety and technical integration review
07 · Power Distribution Is Part of the System

Microgrid controls do not replace electrical engineering.

Transformer, switchgear, ATS, breakers, relays, metering and the point of common coupling determine how the system is connected, isolated and protected.

Voltage levelLV/MV architecture changes transformer, switchgear, protection and equipment interface choices.
PCCDefine the point where utility/grid requirements meet the local microgrid.
ProtectionTrip, interlock, synchronization and fault-isolation behavior must be engineered across modes.
ATS / switchingTransfer and source-selection logic must match controller sequences and supported operating modes.
Explore Power Distribution →
08 · Hybrid / Microgrid Inquiry

Tell us the site objective.

You do not need a finished microgrid specification. A few basic facts are enough to start the architecture review.

No complete specification required.

Already have a hybrid or microgrid proposal?

MFG can review source sizing, interfaces, supplier boundaries and China-side execution before you commit.