A booth gives you a person to talk to. It does not identify who controls production, what will be delivered or how defects will be fixed. For overseas machinery and power-equipment buyers, use these 12 checks before treating a contact as an approved supplier.
A. Identity and control
- Separate the contracting company from the manufacturing site. Ask for each legal name and address. A trading company can be legitimate; the problem is an undisclosed supply chain, not the business model itself.
- Ask who owns product engineering and drawings. Who can approve modifications and control component choices?
- Check manufacturing versus assembly versus outsourcing. Which processes are in-house? Which are subcontracted? What is the evidence?
- Ask for target-market experience that can be verified. Distinguish export experience from claimed approval for your destination country's specific requirements.
B. Product and quotation consistency
- Request the exact model and specification basis. Duty, power rating, frequency, ambient limits, dimensions, materials and accessories must be stated.
- Identify the critical BOM. For generators: engine, alternator, controller and protections. For compressors: engine, air end, rated free air delivery and pressure. For lighting towers: power source, mast and lighting system.
- Ask what changes between sample and series production. Require a written procedure for component substitutions and model revisions.
- Request a like-for-like quote. Compare only when critical specifications, test scope, packing, spares, warranty and Incoterms match.
C. Quality, evidence and accountability
- Ask to see test records for the relevant model. A general showroom demo is not evidence of shipment compliance.
- Understand batch inspection and traceability. How can a failure be traced to specific units, components or production dates?
- Ask how defects are closed. Is there a documented corrective action, retest and confirmation before shipment release?
- Agree on the next verification step. Factory visit, sample evaluation, pre-production approval, load-bank test or pre-shipment inspection—whichever actually addresses the risk.
A practical supplier scorecard
Use Verified / Evidence pending / Not acceptable for each of the 12 checks. Do not convert uncertainty into a fabricated numeric supplier score. Do not publish confidential offers or supplier notes as a public 'approved factory' list.
At the show: record the contact, displayed product and exact open items. After the show: send one common specification sheet to two or three shortlisted suppliers; ask for the missing evidence; arrange targeted visits rather than a sightseeing tour.
When MFG POWER adds value
An overseas buyer may be able to ask these questions in person yet lack the time, language, technical access or China-side follow-up to verify the answers. MFG POWER can help define evidence requests, coordinate site checks, compare configuration differences and track outstanding technical and quality decisions on the buyer's behalf.
This is independent verification support—not a promise that every supplier will pass. Ask us to review a supplier or quotation. See the existing Generator Supplier Qualification Guide for deeper generator-specific requirements.
This is an evidence checklist, not a certification, legal opinion or guarantee of manufacturing performance.
